After studying the local legislation for hours and trying to interpret clauses from different set of building regulations, I want to believe that the layout of the building is now set and I can move on to the design of the elevation treatment. The light well cannot be incorporated due to the limitation of the allowed internal gross area. This is a first design attempt to develop a responsive envelope to the internal accommodation that is less pervasive to the existing structure; it is not complex to construct and makes use of site materials or wide available building components.
No comments:
Post a Comment